Day 29 and the weather couldn’t have been more perfect. Sunny, breezy, warm, but not too hot – spectacular. And it came just in time. The dreary weather had taken its toll on the Team, leaving them listless, tired, and just plain exhausted. Yet they persevered, rallied, and managed to turn out a day full of detail work, full of intricate measurements, and full of hauling themselves up and down ladders in search of a finished exterior. Success! Despite the stain (which we will apply), they finished the exterior! Brad finished his exterior electrical (save for the last doorbell – hey, a potential movie title!), and Dave and Eric finished shingling around the windows (including moving some fragile, antique shingles from one part of the house to another for continuity’s sake), and painting the trim on the new windows. What a relief to have one part of the job wrapped up! I know they needed the sense of finish more than we did (we’re no where near normal inside, so we didn’t so much mind the exterior as it was), and the knowledge that they got it done was not unappreciated. Good work, dudes!
Did you think that this would be the hardest thing you’d ever do?…
published on by
Day 28 and the rainy gray weather just wouldn’t go away. But, Brad managed to do his outdoor electrical work without any trouble (I even “assisted” by standing at the foot of the ladder, and by holding a light while he wired it). We had planned on re-wiring the post light, but when Brad took a look at both the post, and the feed for the electrical, he discovered that the wiring was relatively new, and could be saved (hooray! savings!). The ground wire hadn’t been tied into the outdoor outlets, making them a bit scary to use, so he fixed that up, rewired the box, and voila! Safe outlets! Brad’s main work for the re-wire is almost done, which means that the next phase we’ll see him for is Finish! Within a few weeks, we’ll have outlets, lighting fixtures, appliances and switches energized and buzzing with power. I can hardly wait!
Satisfy my soul, satisfy my soul…
published on by
Day 27 and work cruised along steadily. Floors were sanded lightly to give the next coat of poly something to stick to, and a second coat of poly was then applied. The west bedroom closet floor was coated as well, and finish trim was installed inside the closet. Primer was applied, and the room was cleaned within an inch of its life (He even mopped! Thank you, Eric!). Durock was installed in the master bath, shelving niches for bath products were set in place, and the floor for the shower was packed into position. And, electrical work continued in the basement and upstairs main bath (where detective Brad found that previous electrical work we had done was NOT done correctly. Grr). Slow and steady was the name of the game today, and, appropriately enough, we had a reggae mix on to soothe the day along. Groovy.
Things that make you go “hmmm”…
published on by
Week 6 (!), day 26, and the weather matched my energy level. Gray, heavy, damp, cool. I would probably rather have been making soup, baking bread and watching sappy movies all day. Instead, there were three teams working – with three separate music choices – in three separate areas of the house. In the attic, we had Brad and his helper, Ian, completing the smoke detectors, and replacing all the floor boards; in the master bathroom, we had Caleb preparing the shower floor, and setting the in-floor (radiant) heating pad; and, on the first floor, we had Dave and Eric brushing the first coat of poly onto the stained kitchen floors. Busy, busy, busy.
If a problem comes along, you must whip it…
published on by
Day 25 (Friday) was long. For everyone. The sanding continued on the densest floor known to man until after lunchtime, taking longer than had been hoped for (so it seemed). No matter, though, as the Team managed to get a coat of stain on the floor! Likely the only coat of color, the process will continue with at least 3 coats of polyurethane to seal and protect the floors. The process seemed the most physically taxing on the guys – so much crouching, bending, squatting, being on their knees on hard surfaces, reaching, scrubbing, you name it – but it also seemed to elicit a different kind of excitement. An excitement at seeing the early stages of a finished room? Perhaps. Excitement at conquering the antique floors? Possibly. Let’s just say, the enthusiasm poured into their work, and the floors came out beautifully (from what I can see from the doorways and the outside porch – we can’t walk on them yet).
I’d do it all again…
published on by
Day 24. Day twenty-four. For some reason it seems like a long, long time ago that we started. We are almost at the end of five weeks of actual, constant work, and six weeks with no kitchen. Here, at the (almost) midway point in the renovation, I can start to feel the shift toward finishing. We’re sampling floor stain colors, talking about logistics — where to move our furniture, when to move our furniture, making space in the garage for a workshop — the final flooring phase of the project, discussing plans for a maybe-sometime-next-week cabinet delivery (!), and hoping to get to bathroom tiling started early next week. Things are starting to feel final, pieces of the puzzle are slotting into place, and the house is starting to feel like it will be finished.
Can I have it like that? You got it like that…
published on by
Day 23. And. We. Have. Floors! The guys did a tremendous job, working at a steady pace all day long, blending the new floors with the old, and making the space feel truly whole for the first time ever. It’s amazing. The only hitch we had was when Ke$ha came on the radio, and I had to insist that they use the iPod Touch we have set up for them (we use it to play Pandora internet radio for them, even though Dave and Eric resist at every turn). Our musical tastes don’t always match, but I draw the line at teen pop when floor nailers and saws are running. I think, in the end, they were happy to have the music changed (David Bowie station today), though I don’t even think they noticed the horrid “songs” that were playing for part of the day. Shudder.
Time keeps on ticking, ticking, ticking…
published on by
Day 22 and paint is happening! Ok, so it’s merely priming and first coat kind of stuff, but there is color on the walls, and I can begin to imagine the kitchen as my kitchen, our home, instead of simply a project to be completed. Unfortunately, this also reminds me of just how much I miss having a kitchen, cooking, creating and participating in (culinarily speaking) our most bountiful time of year: summer. I miss cooking. I miss it every time I have a mediocre meal or sandwich (like last night and today) from a take-out place, and I miss it when I put on my summer clothes that just aren’t fitting me quite as well as they did last year (or even earlier this year). I know “this too shall pass” and that it’s all for a good cause, that the reward will be worth the suffering (really, more like inconvenience), but it’s still hard. Sigh.
And it rained all night…
published on by
Day 21 marks the start of week 5, and the start of Phase 2-B: painting and flooring. After a week of watching joint compound dry, now we get to watch paint and stain dry! But, this part will actually be more visually dramatic than last week, though more familiar (we’ve all painted at least once or twice, right?). Choosing colors was tough, especially since we weren’t really prepared to make these choices so soon in the process. Lucky for us, we’d already narrowed down the overall look we wanted to achieve, and were simply choosing the best version of whichever color we liked for a particular space. There are some surprises yet to come, and I don’t want to spoil the effect of the next few days (color will be on the walls tomorrow!), but suffice it to say, our house palette will be beachy, modern, cool-toned and (hopefully) sophisticated. I suppose time will tell whether our paint choices are ones we’ll love – Jeff told me to check with him in two years, and that by then he’ll know whether or not he likes them or not.
Double your pleasure, double the fun…
published on by
Day 19 (Thursday) was a run-around day. Day 20 was a watch-joint-compound-dry day. On Thursday we went to Ashfield to check out stone for our counters, got some paint samples and swatches, Brad finished up some projects in the attic, Dave delivered our quarter-sawn fir flooring to get it acclimated to our space, and Brian from Bird Drywall put on the second coat of joint compound. I’m told that the second coat is the most crucial, as it is often the thickest, and takes the longest to dry. So, while we had lovely almost autumnal weather outside (albeit mildly humid), we had to close up the house and turn on the air conditioning to cut any dampness out of the air. We also turned on our dehumidifier (after I mentioned that we had one, and Brian’s eyes bulged out of his head, in a good way) and a few fans to get the drier air circulating. It must have worked because when Brian got here today, the seams were dry (except for in the bathroom where the mold resistant paper on the sheetrock slows the drying process). Phew. He was glad, and so were we. We’re getting a 4-point treatment (essentially four coats) on our seams which means that Brian will be working here this weekend. We’re on target for beginning to prime next week, and in order to make that happen, he’s got to make up for some of the time lost to waiting for the inspector.