It’s been too long since my last post, but so much has happened, and all in the span of just a few days. I completed my joint compound homework (as promised), preparing the walls and gaps around the ceiling lights as best I could. Team Tile (J.J. and mini-Caleb) arrived on Friday, as scheduled, and worked to get the room ready for Team Carpentry’s (Dave and Jonas) arrival on Monday (today). Not only did they finish the work that absolutely needed to get done before the built-ins could go in, they also made some good progress on one of the shower walls. Bonus!
Monthly Archives: February 2011
The quicker we go, the faster we fall behind…*
published on by
With a sickly (feverish) wee one at home awaiting his arrival, Dave (& Jonas) arrived on Sunday to do the hour or so of work that needed to get done before J.J. could (can) finish the floor in the bathroom. A bit of mud, tape, sawdust and vacuuming, and suddenly the room felt like it was ready to move on. (I’ve been ready to move on for weeks, now. But I digress.) The seam between the durock and sheetrock was bound together – though multiple coats of compound still need to be applied – making the room instantly feel more finished. Nothing like plugging up holes to make a room settle a bit. And, after patching a few more spots where attic air could penetrate our cozy little room, and cleaning up the threshold so that a new non-beveled piece of marble could be installed, Dave and Jonas made a date to come back and finish up the carpentry portion of the project.
I’m crazy but you like it, and you like that it ain’t easy…*
published on by
We. Have. Floors! (Again!) Well, mostly. J.J. arrived on Friday, as promised (thanks, J.J.!) and worked his knees to the bone to get the floor in the family bath done. As done as he could get them, considering that we need a tiny bit of help from Team Carpentry to get the threshold in (need to trim back the wood flooring a bit), and to patch up the wall adjacent the pony wall (which J.J. needs to tile before the built-in gets installed). If you’re confused, you’re not alone. It’s one of those projects where everyone needs everyone else to get the job done correctly. And the fact that our Teams live far from us (a fact that was not a problem during the regular half-house renovation since they were here for days or weeks or months at a time) has become a bit problematic, especially since it’s winter. But we’re all managing as best we can. J.J. sacrificed by putting in two looonnng days to get the floors ready to be walked on, and for that we are eternally grateful. We have a few steps to take yet before this project will really feel like it’s in full swing. But for now, I’m just so happy that something tangible has been done! (No offense to our dear Brad, but I can’t exactly get as excited about electrical that’s operable, ready, and safe, but hidden in the walls and ceilings. Sometimes you just have to see it, you know?)
They make it so hard on us baby, it’s so hard on us baby…*
published on by
Over a week since my last post and not much more has happened in the family bath. Well, except for Brad getting our ceiling fan wired in, installing a light in our new closet (now I have to finish that paint job, too), finishing up the wiring of the floor mat and fixing a sensitive circuit breaker in the basement. I guess that’s a lot, but not very photogenic. We’re still waiting for J.J. to come back (hopefully by week’s end). So we wait some more.
Then put your little hand in mine, there ain’t no hill or mountain we can’t climb…*
published on by
It’s Groundhog Day. The day we’re supposed to (superstitiously) find out how much longer winter is going to last. And the snow in our yard is at least 3′ deep. Groundhog or not, winter is here, and she’s not leaving anytime soon. Our Family Bath project looks like it might not end any time soon, either. Which is starting to really bring me over (you’ll have to watch Better Off Dead for that reference). Sigh.
But let me rewind a bit.