Out with a whimper, it’s not a blaze of glory…*

*Lyrics from MGMT’s Congratulations from their album Congratulations. Don’t ask me what the video means. I have no idea.

Summer has effortlessly shifted into fall, marking the official close to a season that was full of fire and energy, heat and flooding, plenty and too much plenty. Windows were unceremoniously closed, yet screens remain in place; sweaters were unearthed from the drawers, or backs of closets, yet summer clothing has not been put away yet; seasonal cooking has shifted from tomatoes, fresh herbs and all things raw to squashes, soups and an increased interest in baking. The tides have changed, without us really noticing, though we are certainly aware.

Way back when, in late spring (a full two seasons ago!), we met with Mr and Mrs K to discuss ideas for their new kitchen (at that point merely a hope). Meeting after meeting, month after month and we weren’t sure they were going to choose us. Or even start at all. Drawing after drawing, email after email and we finally arrived at a direction, picked a start date, and boldly attempted to renovate an entire kitchen and bathroom in a month. Well, that didn’t quite happen, but it very nearly did: the kitchen is finally done!

read on…

A grown up woman should never fall so easily…*

*Lyrics from ABBA’s Lay All Your Love On Me. Because I was smitten from the get go. Not because I’m Swedish.

Ok, it’s been a while since my last post. That’s because this happened:

Sweet tender niece merely hours old.

See, I was all set to head to Mr and Mrs K’s for a day or two of tile work, electrical and plumbing finishing touches when my sister-in-law went into labor. Needless to say, nothing much mattered after that. Well, all except for her, her husband, and their new daughter (who is perfect, healthy and quite precious – and of course I’m not at all biased). So I missed those bits at the clients’ house. Don’t worry, though, I still have one more visit on the horizon – pictures will be coming.

read on…

I am all the days that you choose to ignore…*

*Lyrics from, you guessed it, more Radiohead! This time from their In Rainbows album, which cemented them for me as a go-to, must-have, favorite band to listen to at all times, preferably late at night, when it’s raining, or when you’re feeling internal (tipsy works, too). This one’s All I Need. Radiohead is all I need.

Client kitchen and bath renovation – weeks 5 & 6

For those of you who are just joining us, or maybe want a refresher, this is where we were merely a month and change ago. With a 4 to 6 week timeframe, and a hope for 4, we began, guns blazing, to tear apart Mr and Mrs K’s kitchen and bathroom. Well, a few weeks later and we’re in the final stretch. I know for them it’s been extremely hard – small child, small dog, small living space, small budget – but I hope it’ll be rewarding in the end. Today they got countertops.

read on…

Just let me state for the record, we’re giving love in a family dose…*

*Lyrics from We Are Family as sung by Sister Sledge. I debated about which of the several horrible videos to share, but settled on the one from Solid Gold. The pyrotechnics alone make it worth the viewing. The outfits, well, they’re just the cherry on top of that sundae. (Oh, and the Solid Gold link is solid.gold.)

Between the after effects of Tropical Storm Irene (hurricane to some of you), and closing on a house for my mom, I’ve had barely a moment to reflect and enjoy the last fleeting moments of a summer that practically sprinted by. Labor Day, traditionally considered the ‘last day’ of summer (though summer lasts well in September, if we’re lucky) became a reason to enjoy not one last lazy day filled with sunshine, hammocks and cookouts, but to enjoy discounts on appliances, toilets and sofas for the new place. And due to the gap in schedules at Mr and Mrs K’s kitchen/bath remodel, I was able to switch gears and get into full remodel zone for my mom’s new condo. So long, summer. I wish I got to know you better.

read on…

Damn it feels good to be a gangsta’…*

*Lyrics from the Geto Boys’ song of the same name. As (poorly) fake sung by fake Kermit here. As heard first in Office Space. Totally not safe for work, by the way. Maybe not safe for most. You’ve been warned.

Client renovation – days 18, 19, 20 (+ 20.5, aka Saturday)

By the third day of the cabinet install it was clear that my position as photographer/designer/jack-of-whatever-trade-you-need was going to be utilized in a new way: as a painter. I was already acting as a coffee fetcher (what else is new), lunch grabber, vacuumer, sweeper, holder of things that require extra hands, trash collector, and back acher. Well, that last part was my own contribution to myself. But, no matter how you sliced it, my camera was going to have to be put down for much of the week. Still, I managed to get some photos (don’t cry!), so you can still inspect the progress for yourself(ves).

read on…

What are we gonna do-hoo with you, you don’t make it easy on me…*

*Lyrics from Jenny Lewis’ song Godspeed from her album Acid Tongue. I’m always impressed when people sound even better live than in their studio album. Good stuff.

Client kitchen – days 16 & 17 (start of week 4)

Cabinets. Oh, boy, cabinets. The week started out rocky-ish, and not in the Sylvester Stalone way. (Well, maybe, but I’ve never seen Rocky, so I can’t say for sure. Stop throwing stuff at me!) Suffice it to say that the cabinet install wasn’t the simple, straightforward, mythically easy process that IKEA claimed. Still, for a budget as tight as Mr and Mrs K had, it was a practical choice, and one that Team Carpentry was determined to make work.

read on…

Back in the high life again…*

*Lyrics from Steve Winwood’s Back In The High Life Again. Yeah, I went there. Oh, and the video is terrifically awful. The ’80s were a different time.

Client kitchen – days 13, 14, 15 and a little bit on 15.5 (aka Saturday)

By the end of week three, the floors had been sanded and coated three times. Let me put that another way: the floors were sanded and coated and sanded and coated and sanded and coated. In that order. Just writing that was exhausting, so you can imagine how tiring it was to do. (I have to imagine it, too, since my primary function was to open and shut windows to avoid thunderstorms, and to turn on or off fans to help the floors dry smooth and clean.) The Team worked extra hard, watched the weather and the humidity adjusting their schedule to suit the optimal times to coat, and managed to get the entire space finished in the span of only a few days.

read on…

If you haven’t got problems I feel bad for you son…*

*Lyrics from Jay-Z’s 99 Problems as resung by Hugo on his album Old Tyme Religion. I may even prefer the Hugo version, though the video is absolutely stupid. The sentiment remains the same. And it ain’t a bitch.

Client kitchen renovation – days 11 & 12

The week started out great. Tile. Flooring. Wall color. Mostly all hits (as I said in my last post, there’s a shade of yellow that’s under investigation). And we even made an ambitious and detailed schedule for all of our sub contractors so we could confirm finish dates and get a game plan for the end date. That’s when we hit our first significant snag. Ugh. The countertop installers have us at the back of the line, the bottom of the list, and aren’t able to complete our project within our overall timeframe. Blerg.

read on…

But don’t ask me where I’ve been or what I’ve done…*

*Lyrics from Amarillo from the Gorillaz album The Fall. The album was recorded using almost exclusively iPad apps. Crazy and cool.

Client kitchen renovation – days 9 and 10 (end of week 2)

With an insanely tight schedule and a rapidly dwindling summer calendar (I hate the knowledge that soon we’ll be voluntarily using blankets, sweaters and other implements of warmth-making) Dave, Jonas and Brian got busy finishing the drywall and flooring installation. Details left to tackle: taping, mudding, sanding, paint and thresholds. Though it may seem like a small list, the actual work involved spanned days. The breakneck speed which started off the short week eased into a quite rapid but not hideously over-fast speed, and the guys put their heads down and got to work. I am constantly impressed with how much they each do (Jonas can paint, don’t let him tell you differently), and how many things they are capable of doing (and well!).

read on…

I bet the groove that you’re hearin’ is keeping you satisfied…*

*Lyrics from 2 In A Room’s 1990 “hit” (can you say it was a hit if you had to hunt wikipedia for information on it?) Wiggle It (Just A Little Bit). This one’s for you, Dave Powell. This is what you get for mentioning off-hand old lyrics to a crappy song from our youth.

Day 8: Client kitchen renovation

My head is still spinning from how much work went on today. After a week of waiting for subcontractors and inspections (passed!), after many mostly quiet days spent twiddling thumbs (or leg jiggling, fingernail biting, pacing, etc.), today Team Carpentry made up for the lack of visible progress and then some. Working through sweaty, humid and dead of summer weather, the guys rolled their way through installing 3/4 of the new hardwood flooring and installing sheetrock on nearly every wall and ceiling. Let me put it another way: there are now floors and walls and ceilings where yesterday there were none. It’s a mighty impressive step toward making the space take shape, toward realizing the vision for the design, toward putting back together the bones of a formerly hard-working (and much missed by Mr & Mrs K) kitchen.

read on…