Day 7 was as busy as ever – we heard the nail gun (and compressor), sawing, some shouting (mainly because the tools are so loud), many a trip up and down the attic stairs and even some laughter. The weather was hotter, but still lovely, and not so humid as to turn everyone grouchy toward one another (though I can’t speak for Brad, the electrician, who spent a fair amount of time in the still hideously uncomfortable attic). With everything buzzing away, I could focus on some other projects that I’ve been trying to find time for – mowing the lawn, refreshing the front planters, and printing out/working on Jeff’s sister’s wedding invites.
Author Archives: kati
Goin’ down (out?) in a blaze of glory…
published on by
Day 6, week 2, and the work is steadily progressing. We got a mini-fridge set up for the crew, and music was wafting through the house as I calmly set out on a leisurely trip around the area to run errands. Fields of corn bent in the wind, the sun baking sweet goodness into every kernel. Trees sang in the constant changing breeze, as the leaves scuffed against one another, dangling gently from bowed limbs. Ahhh, it was spectacular today.
What’s happening all over? I’ll tell you what’s happening all over…
published on by
Day 5 started off with a complex question: do we want to preserve the ceiling height in the original part of the kitchen (8′-6”) or lower the ceiling (8′) to maintain a smooth continuous ceiling throughout the space? Budget issues prevented the best possible solution (i.e., rip off the roof of the addition and raise the outer wall to the proper and consistent height of the entire first floor), so we were left with two viable solutions. This was a complex decision because choosing either way created a whole slew of work and issues to solve (that had to happen before work could continue in any significant way), as well as compromises to the finished look of the space. Did we prefer the volume to the unity of a flat ceiling? Did we want to vault the ceiling and create a new architectural story? Could we find a light to address an angled ceiling in time for the electrician to move forward? Did they order enough/the right materials? Ultimately we all concluded that with either choice we had to give something up.
The calm amid the storm…
published on by
Day 3 and 4 have been much less dramatic, and therefore less photogenic. Much of what’s happening is either more of the same (demo) or planning, and you can’t really photograph that. The crew is placing orders for lumber, and expects to be framing as early as Friday. Although, the mini-drama has been that a week’s worth of not enough sleep, not being able to cook, and having nothing left to wear (we skipped our weekend laundry because we were too busy prepping the floors to protect them from the trampling they are getting daily) caught up with me, and I had my first tearful moment. Much like the thunderstorm that was building for days, humidity rising causing irritability and discomfort, I too just needed to let out some water to let the beautiful weather shine through. And it’s beautiful today! I also fell asleep while watching TV, sitting up on the sofa, about 20 minutes into a show I picked (Top Chef). A clear sign that I was overtired, and just needed a good night’s sleep.
Busy, busy, busy…
published on by
Day two demolition finished with only a little bit of blood spilled (culprits: nail and lathe in walls, wily little buggers), and plenty of sweat. All in all, despite mild injuries (I was assured they were “merely flesh wounds” and was “just a scratch”) it was a great day. Plumbing that was tangled and twisted and altogether not quite cutting it anymore was completely removed like a tumor. Walls that existed have been reduced to a single post; floors have been removed and have vanished from the house, just like that. Ceilings came down, raining plaster on the crew – they even had to take mini-showers in the yard with the hose. When I asked if they needed towels, I was told, “Nah, I’ll just drip dry in the yard.” Adorable! Hard work like that deserves a reward that a “thank you” just doesn’t seem to provide. I’ll think of something…
Welcome to the jungle…
published on by
Ok, where, oh, where to begin?
8am-ish: Contractors and electrician arrived
810am: Jeff and I started bickering
820am: First hammer swing, subsequent dust bowl began
830am: Dumpster arrived
831am: Jeff yelled at me (“Once is enough!”)
832am: I decided not to help Jeff anymore
840am: Jeff and I apologized
845am: We both wished we could have a nap
The rest of the day was a mix of noises – shoveling, hammering, banging, prying, sawz-all-ing, classic rocking, chatting, barking, panting. We both spent much of the day fighting sleepiness and soreness, and tried to keep the dog as chilled out as possible. Much was accomplished in one tiny day, yet much more is yet to be done. Mostly, some of the underlying structure of the house was uncovered for the first time in (probably) 90-ish years, exposing the home’s flaws as well as its unique story.
One more time, for the cheap seats!
published on by
Ok, so it’s about 12 hours before mayhem begins. Dumpster scheduled for delivery in the morning, dudes will be showing up (quantity?) starting around 8am, and the prep work here isn’t done yet. Nearly, but not yet. Whew, it’s gonna be a long summer.